Generate electricity directly at your facility
to reduce electricity bills and energy costs.
We analyze usage patterns, contracted power, and available installation space to provide a self-consumption system suited to your facility.
Generate electricity at the facility
Reduced purchased electricity · Lower electricity bills
From consultation to after-sales management, we proceed through a systematic process.
Electricity usage analysis
Site survey
Optimal capacity design
Economic feasibility review
Business terms negotiation
and contract execution
Regulatory review &
permit processing
Consultation with KEPCO if required
Structure & equipment manufacturing
Structural & electrical works
Inspection by relevant authorities
System performance verification
Power generation monitoring
and operation management
Regular inspection and maintenance
We analyze optimal capacity and economic benefits based on actual electricity usage patterns.
| Industry | Manufacturing |
|---|---|
| Average Monthly Electricity Usage | 100,000 kWh |
| Installation Capacity | 100 kW |
| Estimated Annual Generation | Approx. 120,000 kWh |
| Self-Consumption Rate | 95% |
| Annual Electricity Cost Savings | Approx. KRW 20 million |
| Payback Period | Approx. 4.5 years |